• BombOmOm@lemmy.world
    link
    fedilink
    English
    arrow-up
    2
    ·
    11 months ago

    Some pretty heavy and expensive machinery is required for the swaps. If there are multiple battery standards, now those facilities need to invest in even more expensive and heavy machinery variants as well as stock even more horrendously expensive batteries. The idea was impractical to start, now there is this monumental added expense.