- cross-posted to:
- technology@lemmy.ml
- technology@lemmy.world
- pcmasterrace@lemmy.world
- cross-posted to:
- technology@lemmy.ml
- technology@lemmy.world
- pcmasterrace@lemmy.world
cross-posted from: https://lemmy.dbzer0.com/post/73628131
cross-posted from: https://lemmy.dbzer0.com/post/73628131
it’s like they’re doing everything they can to make the sabotaging of datacenters as appealing as possible, next step is to label every datacenter with the value of the components inside.