The bill cleared the Assembly and Senate with bipartisan support on Wednesday night and now goes to Governor Gavin Newsom. If he signs it, compatible systems could...
It actually provides power to the house though a regular power socket. (But only if the utility power is also present so it won’t zap workers trying to fix a blackout)
As someone currently going through the hassle of getting a solar setup going, I feel like I should inform people what I have learned. These solar systems use an inverter, and there’s 2 kinds of inverters. 1) the cheap kind that matches an AC wave form and will not work without being connected to a powered grid and 2) a wave generating inverter which will work without a grid allowing your house to still be powered in the event of a power outage
Yup, and the ones here (and NJ I believe passed today, goes into effect next year) require a powered grid to work. Because of the back feed risk, they won’t work with the joking comment about plugging it into a UPS.
BUT!
Some of them you can yank the DC connection to the microinverter (an MC4 connection usually), which can be connected up to a battery system as a backup/bypass mode. The microinverter after that would also allow you to safely connect to grid, or to a dedicated load in an outage.
It actually provides power to the house though a regular power socket. (But only if the utility power is also present so it won’t zap workers trying to fix a blackout)
Thats when you unplug from the wall and into the ups! 😀
As someone currently going through the hassle of getting a solar setup going, I feel like I should inform people what I have learned. These solar systems use an inverter, and there’s 2 kinds of inverters. 1) the cheap kind that matches an AC wave form and will not work without being connected to a powered grid and 2) a wave generating inverter which will work without a grid allowing your house to still be powered in the event of a power outage
Yup, and the ones here (and NJ I believe passed today, goes into effect next year) require a powered grid to work. Because of the back feed risk, they won’t work with the joking comment about plugging it into a UPS.
BUT!
Some of them you can yank the DC connection to the microinverter (an MC4 connection usually), which can be connected up to a battery system as a backup/bypass mode. The microinverter after that would also allow you to safely connect to grid, or to a dedicated load in an outage.
Another $800-$1200 though